Winnipeg Concrete



We work in Winnipeg including:

• Garden City
• West Kildonan
• Old Kildonan
• Maples
• East Kildonan
• North Kildonan
• Transcona
• Birds Hill
• East St. Paul
• North End
• Tyndall Park
• St. James
• Charleswood
• Tuxedo
• Linden Woods
• River Heights
• Fort Garry
• Fort Rouge
• St. Vital
• St. Boniface
• Saint Andrews
• Lockport
• Selkirk
• Saint Norbert
• Stoney Mountain
• Stonewall
• Oak Bluff
• Steinbach
• The Interlake:
   Grand Beach, Winnipeg Beach
   Gimli, Whiteshell, Clear Lake
• Brandon, Dauphin, Virden,
   Portage la Prairie, Lorette, Winkler
• and Manitoba province wide...



Our Video Portfolio

Please take some time to view some of our past work.

Allan Block Retaining Wall Installation


With this residential project, we had removed and disposed of an old rotting wood tie retaining wall, graded and compacted the base with crushed limestone, installed a new Allan Block retaining wall, with drainage, and back fill, as well as re-soiled and seeded the front lawns.

Broomed Concrete Driveway Installation


With this residential project, we had removed and disposed of an old cracked concrete driveway, added gravel, graded and compacted the base, installed wood forms, installed rebar reinforcements, then installed a new broom finished concrete driveway.

Stamped Concrete Sidewalks


With this residential townhome project we removed and disposed of old weathered slate stone tiled sidewalks and doorway entrances, then installed new decorative stamped concrete. The stamp pattern is Grand Canyon Stone and the color is Slate Grey with a charcoal release secondary tone. The job was completed with pressure washing and an application of commercial grade concrete sealer including a non-slip additive.

Resurface Concrete Steps and Landing


In some instances where space allows, steps can be resurfaced. With this residential project, we had partially removed and disposed of concrete steps and landing, installed wood forms, rebar reinforcements, then placed and broom finished a new concrete staircase.

Concrete Sidewalk Installation


With this residential project, we had excavated, graded and compacted the base with 3/4" down limestone, installed wood forming, rebar reinforcements, then placed and broom finished a new concrete sidewalk with solor inset LED lighting.

Concrete Parking Pad Installation


With this residential project, we had excavated, graded and compacted the base with 3/4" down limestone, installed rebar reinforcements, then placed and broom finished a new concrete parking pad.

Concrete Wheelchair Ramp Installation


With this senior citizens condominium complex, we had removed and disposed of a partial concrete sidewalk, graded and compacted the base, then formed and placed a new concrete wheelchair ramp.

Paving Asphalt Approach


With this residential project, we had graded and compacted the base, then paved a new asphalt approach from the city street to a new concrete driveway which we had placed and finished.

Sealing Concrete Driveway


With this residential project, after we had repaired cracks and pressure washed the driveway, we completed the job by applying a protective coating of commercial grade concrete sealer including a non-slip additive.

Paving Speed Bumps


With this townhouse residential project, we installed a number of asphalt speed bumps to slow traffic down. After paving the speed bumps they are painted with commercial grade reflective traffic paint for easy visibility day and night

Asphalt Driveway Sealcoating


With this residential asphalt driveway project, we pressure washed and applied a fresh protective coating of asphalt sealer.

Contact us anytime for a consultation on your home and garden or commercial project.

Call Us


We work in Winnipeg including:

• Garden City
• West Kildonan
• Old Kildonan
• Maples
• East Kildonan
• North Kildonan
• Transcona
• Birds Hill
• East St. Paul
• North End
• Tyndall Park
• St. James
• Charleswood
• Tuxedo
• Linden Woods
• River Heights
• Fort Garry
• Fort Rouge
• St. Vital
• St. Boniface
• Saint Andrews
• Lockport
• Selkirk
• Saint Norbert
• Stoney Mountain
• Stonewall
• Oak Bluff
• Steinbach
• The Interlake:
   Grand Beach, Winnipeg Beach
   Gimli, Whiteshell, Clear Lake
• Brandon, Dauphin, Virden,
   Portage la Prairie, Lorette, Winkler
• and Manitoba province wide...



     WPG Concrete Home     |     About Us     |     Contact Us

All contents © wpgconcrete.com Used by permission only.